GE V6 User Manual Page 20

  • Download
  • Add to my manuals
  • Print
  • Page
    / 269
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 19
Secure Perfect 6.1.1 User Manual 18
Getting Started
Reference Topic:
Secure Perfect Services
Before you proceed, make sure that your peripheral system hardware is installed and running. This
includes micros, readers, modems, printers, and network lines. Refer to your Secure Perfect Installation
Guide or follow specific installation instructions for your brand of hardware.
The following order is recommended for initial setup, beginning with configuring your Server computer
Secure Perfect system:
1. Set system parameters.
2. OPTIONAL: Define facilities.
3. Identify clients.
4. Create permissions.
5. Add operators.
6. Set up schedules and events.
7. Configure devices.
8. Create access rights, persons, and badges.
9. Back up your system. (This procedure is detailed in your Secure Perfect Installation Guide.)
10. Configure client computers. (This procedure is detailed in your Secure Perfect Installation
Guide.)
Related Documentation
Reference Topic:
Navigational Conventions
For more information about Secure Perfect Editions and hardware that works with it, consult the
following:
Micro/5 Installation Guide
Micro/PX-2000 and Micro/PXN-2000 Installation Guide
Micro/PX-2000 and Micro/PXN/2000 Microcontroller Quick Installation Instructions
Secure Perfect Installation Guide
Badge Designer Manual for Picture Perfect v3 and Secure Perfect v6
These documents and others are included on the Documentation CD-ROM in PDF format. The CD
is included in the media kit, shipped with your system. You must have Adobe Acrobat Reader installed on
your computer to view PDF documents. For your convenience, a copy of the Adobe Acrobat Reader
software is included on the CD.
Sources of training material include the following:
1. Additional detail or related information can be viewed by clicking the linked Reference Topics listed
at the bottom of each topic pane.
2. A Training CD-ROM is shipped with each system media kit. The CD contains an operations and
training course that consumes approximately 16 hours.
You may want to take advantage of the XtremeLearning library of convenient, comprehensive, and
interactive Web-based training courses available through your GE Security Business Partner.
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 268 269

Comments to this Manuals

No comments