GE Oil & Gas
Time-Saving Wellheads
Pressure Control SH3 Speedhead
System
Top Flange
Size
Top Flange
Pressure (psi)
Surface
Casing
Casing for
Lower Hanger
Casing or Tubing
for Upper Hanger
11” 5,000/10,000
9-5/8” 7” 2-3/8” thru 4-1/2”
10-3/4” 7-5/8” 2-3/8” thru 4-1/2”
13-5/8” 5,000/10,000 13-3/8”
8-5/8” 2-3/8” thru 5-1/2”
9-5/8” 2-3/8” thru 7”
10-3/4” 2-7/8” thru 7-5/8”
Operation Conventional SH3 System
Cut Pipe and Weld on Starting Head As Required As Required
Wait-on-Cement Intermediate Casing As Required As Required
Release Hanger Running Tool and Wash Out N/A 1 Hour
Install and Test Annular Seal N/A 1 Hour
Break Connection and Lift BOP Stack 4 Hours N/A
Install Slip Hanger and Rough Cut Casing 3 Hours N/A
Final Cut Casing and Install Intermediate Spool 4 Hours N/A
Nipple-Up BOP Stack 8 Hours N/A
Test BOP Stack As Required As Required
Tubing Completion As Required As Required
Totals 19 Hours 2 Hours
Time Saved (17 Hours) x Hourly Rig Rate = Money Saved
Typical Time Savings with SH3 System —
295-2669
The SH3 Speedhead™ System takes multi-bowl technology
one step further than ever before. By landing two strings
of pipe in one compact forged housing, the SH3 system
eliminates one complete BOP nipple-down/nipple-up thereby
saving signicant rig time. Additionally, specially designed
service tools can reduce installation time even further. The
time saved (estimated at approximately 17 hours) makes this
product a cost-eective alternative to conventional spool type
surface wellheads.
Compared to conventional wellheads, the SH3 wellhead
improves safety by reducing the number of potential leak
paths. The system completely eliminates one major ange
connection and replaces all external lockdown screws with
internal retaining rings similar to those used on subsea
systems.
In order to take full advantage of the time-saving capabilities
of this system, the SH3 system is normally recommended for
applications where the risk of a casing becoming stuck is
very low.
Features —
Improved safety
Eliminates one ange
Eliminates all lockdown screws
Time savings
Reduced BOP/diverter handling
Replaces lockdown screws with lock rings
Flexible system
Emergency equipment
Alternate casing programs
Adapts to conventional equipment for extended
casing programs
Availability —
Page view 0
1 2

Summary of Contents

Page 1 - Time-Saving Wellheads

GE Oil & GasTime-Saving WellheadsPressure Control SH3 Speedhead™ SystemTop Flange SizeTop Flange Pressure (psi)Surface CasingCasing for Lower Hang

Page 2 - SH3 Speedhead

GE © 2013. All rights reserved.10/13, PC #04-0395 rev 2geoilandgas.com/pressurecontrolSH3 Speedhead™ SystemEquipment Options —