GE Surface Time-Saving Wellheads Brochure

Browse online or download Brochure for Unknown GE Surface Time-Saving Wellheads. GE Surface Time-Saving Wellheads Brochure User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 2
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
GE Oil & Gas
Time-Saving Wellheads
Pressure Control LSH Land Speedhead
System
The LSH Land Speedhead™ System is designed for use as
a two-stage starting head, combining the casing head and
casing spool into a single housing. The BOP stack is made
up to the starting head before drilling commences and is
not removed until two strings of casing have been run. This
technique impacts both rig costs and safety. By landing two
casing strings in one compact forged housing, the LSH system
eliminates one complete BOP nipple-down/nipple-up thereby
saving signicant rig time. By reducing handling of wellhead
and BOP equipment and by minimizing potential wellhead
leak paths, safety is substantially improved. The LSH system
oers an economical alternative to the SH2 or SH3 speedhead
systems for less demanding applications.
Features —
Improved safety
Field-proven
Intermediate casing landed, locked down and external
seal tested without lifting BOP
Time saving
Estimated 17 hours per well compared to conventional
Eliminates wait-on-cement time
Light weight/low height
Flexible system
Standard interface with completion equipment
Alternate casing programs
Optional hangers for intermediate casing
Emergency hangers for intermediate casing strings
available
Optional back pressure valve preparation available in
the upper LSH mandrel casing hanger
Available with the S4 Surelok (PC #05-0224) bottom
Typical Casing Programs Available —
295-3712
Top Flange
Size
Top Flange
Pressure (psi)
Surface
Casing
Intermediate
Casing
Production Casing
or Tubingless
Completion (TLC)
11” 3,000/5,000
9-5/8” 7” 2-7/8” thru 4-1/2”
10-3/4”
7” 2-7/8” thru 4-1/2”
7-5/8” 2-7/8” thru 5”
8-5/8” 2-7/8” thru 5-1/2”
13-5/8” 3,000/5,000
11-3/4”
8-5/8” 2-7/8” thru 5-1/2”
9-5/8” 2-7/8” thru 7”
13-3/8”
8-5/8” 2-7/8” thru 5-1/2”
9-5/8” 2-7/8” thru 7”
Page view 0
1 2

Summary of Contents

Page 1 - Time-Saving Wellheads

GE Oil & GasTime-Saving WellheadsPressure Control LSH Land Speedhead™ SystemThe LSH Land Speedhead™ System is designed for use as a two-stage star

Page 2 - LSH Land Speedhead

GE © 2013. All rights reserved.10/13, PC #05-0143 rev 2geoilandgas.com/pressurecontrolLSH Land Speedhead™ SystemEquipment Options —

Comments to this Manuals

No comments