GE SV-60 Operations Manual Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 18
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
www.ge.com/inspectiontechnologies
System Setup and Operation (continued)
Setup
1. With the power switch in the OFF position, plug the AC power cord into the power input
port on the back of the unit and then into a grounded receptacle.
2. Plug a light guide with appropriate adapter installed into the light exit socket.
Note: The light guide is fully inserted when the light guide spring snaps into the
groove cut into the socket.
3. Turn the power switch ON and wait 15 seconds for the lamp to complete the warm-up
cycle.
Note: If the power has just been turned OFF, allow 15 seconds for complete discharge
before turning ON again.
4. Set the light intensity to the desired level by turning the Light Intensity Control Knob.
Back
Front
ELSV-60 Light Source 7
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 17 18

Comments to this Manuals

No comments