GE PBS & PBP Installation Guide

Browse online or download Installation Guide for Unknown GE PBS & PBP. GE PBS & PBP Installation Guide User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 4
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
GEH-5918
INSTRUCTIONS
SKYGARD
TM
POWR/BRACKET
®
Retrofit Optical
READ THOROUGHLY BEFORE INSTALLING
35-201578-111 (3/04)
GENERAL
This luminaire optical is designed for outdoor lighting
service, and should not be used in areas of limited ventila-
tion, or in high ambient temperature enclosures. Best results
will be obtained if installed and maintained according to
following recommendations.
UNPACKING
This luminaire optical has been properly packed so that
no part should have been damaged during transit. Inspect to
confirm.
TOOLS
Installation will require either a slotted screw driver or
5/16 hex drivers.
INSTALLATION
After the luminaire optical has been unpacked and
inspected, it may be installed according to the following
instructions.
STEP 1
Remove the lamp and retain.
Remove the existing refractor optical by releasing the
bail latches as shown in Figure 1 and lowering the
optical to remove.
CAUTION
Risk of burn
Allow lamp/fixture to cool before
handling
WARNING
Risk of electric shock
Turn power off before servicing
see instructions
STEP 2
If this is a 400 watt mercury Powr/Bracket go to STEP 6.
Remove the socket bracket screws and lower the socket
and bracket from the casting shown in Figure 2.
Retain the screws.
Figure 1
Figure 2
SKYGARD
Optical
New
Socket
Bracket
Release
Latches
Lower
Optical
Use Slotted
or 5/16
inch Hex
Driver
ÉTAPE 3
Enlevez l'ancien étrier de douille sur la douille et jetez-le.
ÉTAPE 4
Fixez le nouvel étrier en l'orientant conformément au
schéma de la figure 4.
ÉTAPE 5
Réinstallez l'étrier avec la douille sur le bo
îtier du lumi-
naire, conformément à la figure 5.
Figure 4
Figure 6
Passer sur le crochet et tirer
vers le bas
Fermetures
à arceau
Figure 5
Vue du dessous
de la douille
Vue du dessus
de la douille
Nouvel étrier
coins coupés
Figure 3
Utilisez un tournevis à
empreinte hexagonale
ou un embout
hexagonal de 5/16 po.
Jetez le
vieil
étrier
ÉTAPE 6
Fixez le module optique avec les fermetures à arceau, puis
réinstallez la lampe.
These instructions do not purport to cover all details or variations in equipment nor to provide for every possible contingency to be met in connection with installation, operation or
maintenance. Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser’s purposes, the matter should be referred
to GE Lighting Solutions.
g
GE Lighting Solutions is a subsidiary of the General Electric Company. Evolve and other trademarks belong to GE Lighting Solutions. The GE brand and logo are trademarks of the General Electric Company.
© 2011 GE Lighting Solutions. Information provided is subject to change without notice. All values are design or typical values when measured under laboratory conditions.
GE Lighting Solutions • 1-888-MY-GE-LED • www.gelightingsolutions.com
16943533----888
g
GE
Lighting Solutions
Page view 0
1 2 3 4

Summary of Contents

Page 1 - Retrofit Optical

GEH-5918INSTRUCTIONSSKYGARDTM POWR/BRACKET®Retrofit OpticalREAD THOROUGHLY BEFORE INSTALLING35-201578-111 (3/04)GENERALThis luminaire optical is desig

Page 2 - AVERTISSEMENT

STEP 3• Remove the old socket bracket from the socket anddiscard.STEP 4• Attach the new bracket in the orientation shown inFigure 4.STEP5• Reattach th

Page 3

STEP 3• Remove the old socket bracket from the socket anddiscard.STEP 4• Attach the new bracket in the orientation shown inFigure 4.STEP5• Reattach th

Page 4

GEH-5918INSTRUCTIONSSKYGARDTM POWR/BRACKET®Retrofit OpticalREAD THOROUGHLY BEFORE INSTALLING35-201578-111 (3/04)GENERALThis luminaire optical is desig

Comments to this Manuals

No comments