GE EL Series Installation Guide Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 6
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
Lutron Interface
0-10V
Output
GND
N
Switched Hot/Out
Constant Hot/In
EcoSystem
Digital Link
PSU
Light Engine
Line
Neutral
DALI
DALI/0-10V
0-10V
Red
Black
Red
White
Violet
White
White
Blue
Black
Grey
Orange
Black
+
+
GND (Green-Yellow)
Neutral (White)
Line (Black)
EcoSystem Link E1
EcoSystem Link E2
AC line
Violet/White
21
Carefully place enclosure cover next to electrical
enclosure. Follow the wiring diagram, insert stripped wires
into Lutron interface connector as described in next step.
See previous steps 1 and 2.
1/4-20 screws
Driver Installation (EP-DKIT400-LN and EL-DKIT360-S-LN)
Wiring Diagram
Electrical Connections
4
Replace electrical enclosure cover. Enclosure cover is on
top for installation.
3
First connect the black (line) and white (neutral) wires
of the AC line to the black and white wires of the power
supply using 18-24AWG (0.82-2.08mm
2
) twist-on wire
connectors. Next connect the luminaire wires to the blue
and red wires of the power supply. Connect the green
wires to the ground screw.
To dimming
controller
(optional)
AC line
From
luminaire
Page view 2
1 2 3 4 5 6

Comments to this Manuals

No comments