Ge ZV925SLSS User Manual Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
12
Align the template with the marks on the ceiling
and tape in place.
Be sure the template is oriented correctly with the
front of the hood.
Use a plumb bob to be sure the mounting holes
will provide parallel alignment with the countertop
below.
• Center punch all hole locations.
Drill pilot holes in the 4 screw locations. Use a 3/16"
bit and drill approximately 1-1/2" deep.
Drive 4 hex head wood screws into the center of
the ceiling joists and cross framing. Leave a 1/4"
gap to allow the screw head to engage the keyhole
slots on the support frames.
• Cut the 8-1/2" duct opening through the sheet rock.
STEP 1 MOUNT TEMPLATE
Installation Instructions
STEP 2 ADJUST FRAME HEIGHT
•Measure exact ceiling height.
Find the exact frame height
required on the chart on page 6.
Remove 2 screws on each of the
4 sides of the frame to loosen the
upper structure, lower structure
and blower/motor.
Adjust the height “X”, according to
the chart on page 6. Use a total of
32 screws (8 screws on each side)
to secure the upper structure,
lower structure and blower/
motor together.
1/4" Gap
24"min.
30"max.
36"min.
Frame
height
2-3/4"
Ceiling
height
X
49-80406
Printed in Italy 04-06 JR
36Hood
Template
8-1/2
Dia.
Cut a 1Dia.
Wire Access
Hole
Cut a 1Dia.
Wire Access
Hole
Drill 3/16
Pilot Holes
Approx. 1-1/2
Deep
Drill 3/16
Pilot Holes
Approx. 1-1/2
Deep
10-1/16to
Centerline
of Holes
7-1/16to
Centerline
of Holes
FRONT OF HOOD
7-1/16to
Centerline
of Holes
,167$//$7,21³9(17('727+(2876,'(
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 27 28

Comments to this Manuals

No comments