Ge ZV925SLSS User Manual

Browse online or download User Manual for Hoods Ge ZV925SLSS. GE ZV925SLSS User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Installation
Instructions
36" Island Chimney Vent Hood
ZV925
49-80329-4
Page view 0
1 2 3 4 5 6 ... 27 28

Summary of Contents

Page 1 - Instructions

InstallationInstructions36" Island Chimney Vent HoodZV92549-80329-4

Page 2

10Top view – ceiling joists run perpendicular to front of hoodTop view – ceiling joists at angle to front of hoodInstallation PreparationCONSTRUCT CEI

Page 3 - Design Information

Ceiling Joist10-3/42x 4 Min.Cross FramingHeightAdjustmentScrew Holes7-1/16"11CONSTRUCT CEILING SUPPORT CONTINUEDInstallation PreparationDuctwork

Page 4 - Advance Planning

12• Align the template with the marks on the ceiling and tape in place. – Be sure the template is oriented correctly with the front of the hood.• U

Page 5

13Installation InstructionsSTEP 3 CUT DUCT TO LENGTH FOR VENTED INSTALLATION• Measure from house duct to exhaust opening.• Cut the 8" duct

Page 6

14STEP 7 CONNECT CABLES• Join the two cable connectors at the front of the hood. Secure the cables behind the retainer clip.Installation Instruction

Page 7 - PRUDENCE : LEVEZ LA HOTTE À

15Installation InstructionsSTEP 8 CONNECT ELECTRICALVerify that power is turned off at the source.WARNING: If house wiring is not 2-wire with a grou

Page 8

16Installation InstructionsSTEP 9 PREPARE THE DUCT COVERS• Remove the plastic protective covering on all duct pieces.• Install 3 cage nuts on eac

Page 9

17Installation InstructionsSTEP 11 INSTALL LOWER DUCT COVER• Place rear duct cover onto the hood.• Place front duct cover onto the hood.• Secure

Page 10 - Installation Preparation

18Installation Instructions• Align the template with the marks on the ceiling and tape in place. – Be sure the template is oriented correctly with

Page 11

19Installation InstructionsSTEP 4 INSTALL UPPER SUPPORT FRAME• Raise the upper support toward the ceiling.• Thread the house wiring through one of

Page 12 - Installation Instructions

2Installation InstructionsWARNING: TO REDUCE THE RISK OF FIRE, ELECTRICAL SHOCK OR INJURY, OBSERVE THE FOLLOWING:A. Use this unit only in the manner

Page 13

20STEP 5 INSTALL LOWER STRUCTURE TO UPPER STRUCTURE• Slide lower frame into the upper frame. Match the marked alignment holes.• Secure the upper

Page 14 - AVERTISSEMENT : Il faut deux

21Installation Instructions,167$//$7,21³5(&,5&8/$7,1*STEP 9 CONNECT CABLES• Join the two cable connectors at the front of the hood. Secure t

Page 15 - AVERTISSEMENT :

22Installation Instructions,167$//$7,21³5(&,5&8/$7,1*STEP 10 CONNECT ELECTRICALVerify that power is turned off at the source.WARNING: If hous

Page 16

23Installation Instructions,167$//$7,21³5(&,5&8/$7,1*STEP 11 PREPARE THE DUCT COVERS• Remove the plastic protective covering on all duct pi

Page 17

24Installation Instructions,167$//$7,21³5(&,5&8/$7,1*STEP 13 INSTALL LOWER DUCT COVER• Place rear duct cover onto the hood.• Place front d

Page 18

25Installation Instructions,167$//$7,21³5(&,5&8/$7,1*STEP 15 INSTALL FILTERSIMPORTANT: Check to be sure that the main ON/OFF switch next to t

Page 19

26Notes

Page 20

27Notes

Page 21

Note: While performing installations described in this book, safety glasses or goggles should be worn.For Monogram® local service in your area, call

Page 22

3Design InformationPRODUCT DIMENSIONSCONTENTSDesign InformationProduct Dimensions ...

Page 23

Advance PlanningADVANCE PLANNINGDuctwork Planning• These vent hoods are equipped for 8" round ductwork. • Determine the exact location of the ven

Page 24

5DUCT FITTINGSThis Hood Must Use an 8d Round Duct. It Can Transition to a 3-1/4d x 12d Duct.Use this chart to compute maximum permissible lengths fo

Page 25

DETERMINE INSTALLATION HEIGHT• Decorative duct covers are provided to conceal the ductwork running to the ceiling.• This hood can be installed for r

Page 26

7Installation PreparationTOOLS AND MATERIALS REQUIRED(NOT SUPPLIED)Pencil and tape measurePliers120V 60Hz. 15 or 20 Amp, 2-wire with ground. properly

Page 27

Installation PreparationPARTS PROVIDEDLocate the parts packed with the hood.HARDWARE PACKAGELocate and check contents. Screws shown actual size.Air

Page 28 - 49-80329-4

9Plan the Location of the Hood and Ductwork• Use a plumb bob to check the location. The countertop/cooktop below the hood must be centered with the h

Comments to this Manuals

No comments