InstallationInstructions36" Island Chimney Vent HoodZV92549-80329-4
10Top view – ceiling joists run perpendicular to front of hoodTop view – ceiling joists at angle to front of hoodInstallation PreparationCONSTRUCT CEI
Ceiling Joist10-3/42x 4 Min.Cross FramingHeightAdjustmentScrew Holes7-1/16"11CONSTRUCT CEILING SUPPORT CONTINUEDInstallation PreparationDuctwork
12• Align the template with the marks on the ceiling and tape in place. – Be sure the template is oriented correctly with the front of the hood.• U
13Installation InstructionsSTEP 3 CUT DUCT TO LENGTH FOR VENTED INSTALLATION• Measure from house duct to exhaust opening.• Cut the 8" duct
14STEP 7 CONNECT CABLES• Join the two cable connectors at the front of the hood. Secure the cables behind the retainer clip.Installation Instruction
15Installation InstructionsSTEP 8 CONNECT ELECTRICALVerify that power is turned off at the source.WARNING: If house wiring is not 2-wire with a grou
16Installation InstructionsSTEP 9 PREPARE THE DUCT COVERS• Remove the plastic protective covering on all duct pieces.• Install 3 cage nuts on eac
17Installation InstructionsSTEP 11 INSTALL LOWER DUCT COVER• Place rear duct cover onto the hood.• Place front duct cover onto the hood.• Secure
18Installation Instructions• Align the template with the marks on the ceiling and tape in place. – Be sure the template is oriented correctly with
19Installation InstructionsSTEP 4 INSTALL UPPER SUPPORT FRAME• Raise the upper support toward the ceiling.• Thread the house wiring through one of
2Installation InstructionsWARNING: TO REDUCE THE RISK OF FIRE, ELECTRICAL SHOCK OR INJURY, OBSERVE THE FOLLOWING:A. Use this unit only in the manner
20STEP 5 INSTALL LOWER STRUCTURE TO UPPER STRUCTURE• Slide lower frame into the upper frame. Match the marked alignment holes.• Secure the upper
21Installation Instructions,167$//$7,21³5(&,5&8/$7,1*STEP 9 CONNECT CABLES• Join the two cable connectors at the front of the hood. Secure t
22Installation Instructions,167$//$7,21³5(&,5&8/$7,1*STEP 10 CONNECT ELECTRICALVerify that power is turned off at the source.WARNING: If hous
23Installation Instructions,167$//$7,21³5(&,5&8/$7,1*STEP 11 PREPARE THE DUCT COVERS• Remove the plastic protective covering on all duct pi
24Installation Instructions,167$//$7,21³5(&,5&8/$7,1*STEP 13 INSTALL LOWER DUCT COVER• Place rear duct cover onto the hood.• Place front d
25Installation Instructions,167$//$7,21³5(&,5&8/$7,1*STEP 15 INSTALL FILTERSIMPORTANT: Check to be sure that the main ON/OFF switch next to t
26Notes
27Notes
Note: While performing installations described in this book, safety glasses or goggles should be worn.For Monogram® local service in your area, call
3Design InformationPRODUCT DIMENSIONSCONTENTSDesign InformationProduct Dimensions ...
Advance PlanningADVANCE PLANNINGDuctwork Planning• These vent hoods are equipped for 8" round ductwork. • Determine the exact location of the ven
5DUCT FITTINGSThis Hood Must Use an 8d Round Duct. It Can Transition to a 3-1/4d x 12d Duct.Use this chart to compute maximum permissible lengths fo
DETERMINE INSTALLATION HEIGHT• Decorative duct covers are provided to conceal the ductwork running to the ceiling.• This hood can be installed for r
7Installation PreparationTOOLS AND MATERIALS REQUIRED(NOT SUPPLIED)Pencil and tape measurePliers120V 60Hz. 15 or 20 Amp, 2-wire with ground. properly
Installation PreparationPARTS PROVIDEDLocate the parts packed with the hood.HARDWARE PACKAGELocate and check contents. Screws shown actual size.Air
9Plan the Location of the Hood and Ductwork• Use a plumb bob to check the location. The countertop/cooktop below the hood must be centered with the h
Comments to this Manuals