GE Valve Regulators Mooney_Flowgrid_iom Service Manual

Browse online or download Service Manual for Welding System GE Valve Regulators Mooney_Flowgrid_iom. GE Valve Regulators Mooney_Flowgrid_iom Technical Specifications User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Table of Contents
Product Description ............................................................................1
Regulator Markings .............................................................................3
Nameplate Information ....................................................................3
Principles of Operation ......................................................................4
Hydrostatic Testing ............................................................................. 5
Installation ...............................................................................................6
Product Description
The Mooney Flowgrid regulator is an easy to maintain
regulator designed to be used primarily with a self
contained pilot system. The Flowgrid regulator has
several unique features that add to its versatility such as:
In line maintenance
Replaceable trim
Reversible trim parts
Non stretching fabric reinforced diaphragm for
stability and fast response at all temperatures
Positive spring shutoff
Two-stage pressure drop to minimize noise and
provide cavitation protection
Scope
This manual provides installation, operation, and maintenance
instructions for the Mooney Flowgrid regulator. Instructions for the
Mooney Series 20 Pilot will be found in a separate manual.
GE Oil & Gas
Mooney
*
Flowgrid
*
Regulator
Installation, Operation and Maintenance Manual
Piping Details .......................................................................................... 7
Start-up and Operation .................................................................. 11
Maintenance ....................................................................................... 13
Troubleshooting ................................................................................. 15
Warranty ................................................................................................ 16
Product Support ................................................................................. 16
GE Oil & Gas has secured global PED EN 334 certification
for its Mooney Flowgrid regulators demonstrating our
commitment to quality and safety. The certification was
awarded by DVGW (the German Technical and Scientific
Association for Gas and Water), one of the world’s most
recognized industry certification bodies and the largest
gas and water industry certification agency in Europe.
GE Oil & Gas has also secured the following verifications;
ISO 9901, ISO 14001, CRN along with others ensuring the
safety and quality of the Mooney regulator.
Page view 0
1 2 3 4 5 6 ... 15 16

Summary of Contents

Page 1 - Regulator

Table of Contents Product Description ...1Regulator Markings ...

Page 2 - Figure 1 - Flowgrid Parts

2nd Stage Regulator1st Stage RegulatorPilot #1Pilot #210 1st Stage Regulator1. Filter supply connected from inlet connection on regulator body to Ty

Page 3 - Nameplate Information

11WARNING The instruction manual for the PILOT(S) being used should be consulted to ensure that the installation and start up instructions for the pi

Page 4 - Principles of Operation

12Standby Monitor NOTE: This procedure is based on the 1st Regulator being the operating regulator and the 2nd regulator being the monitor regulator.1

Page 5 - Hydrostatic Testing

13Standby MonitorWorking Monitor 1. Purge station and open outlet regulator or vent to allow flow through the station. 2. Set pilot (#3) to a hig

Page 6 - Installation

14 Maintenance (cont’d) Assembly1. Disconnect control lines(s) and pilot supply line from pilot system. 2. Loosen main spring case nuts in a criss

Page 7 - Piping Schematics

15 Troubleshooting First Steps1. Verify the regulator specifications fit the application conditions. Min/max inlet pressure, control pressure ran

Page 8

GEA 19583 Mooney Flowgrid IOM ManualRev 08.2012GE Oil & Gas2822 S. 1030 WestSalt Lake City, UT 84119T: +1 801.487.2225F: +1 801.487.2587mooney.inq

Page 9

2Materials of Construction Body & Spring Case ASTM A 216 WCB Carbon SteelSpacer ASTM A 216 WCB Carbon SteelThrottle Plate 17-4PH Stainless SteelD

Page 10 - Piping Schematics (cont.)

Front ViewBack ViewTop View 3 Regulator MarkingsNameplate Information 1. American National Standards Institute (ANSI) pressure class rating of the

Page 11 - Start up and Operation

4 Figure 4 - Pressure Reducing Confi guration Fully Closed Principles of OperationPilot Supply Pilot SenseConnectionRestrictorInlet OutletPilot OutletC

Page 12 - Standby Monitor

5 A back pressure regulator or relief regulator controls upstream pressure instead of downstream pressure. The control action in the pilot is the rev

Page 13 - Maintenance

6 InstallationWARNING 1. PERSONNEL: Installation of the Flowgrid regulator should be made by qualified personnel familiar with high pressure piping an

Page 14 - Bolting Torque Values

Piping Schematics 1. Single Port Regulator (PRV)2. Single Port Regulator (BPV)3. Dual Port Regulator/Single Pilot/(PRV)4. Dual Port Regulato

Page 15 - Troubleshooting

Piping Schematics (cont.) 3. Dual Port/Single Pilot (Pressure Reducing Regulator)4. Dual Port/Single Pilot (Back Pressure Regulator) 5. Dual Port/D

Page 16 - Rev 08.2012

Piping Schematics (cont.)7. Standby Monitor with Differential Pressure Greater than 60 psi (4.13 bar) Operating Regulator Monitor Regulator8. St

Comments to this Manuals

No comments