GE ZV421 User Manual Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
8
Installation Preparation
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Pencil and tape measure
Pliers
Electric or battery operated drill
and 3/16", bits, Phillips and Flat
Blade Screwdriver bits.
120V 60Hz. 15 or 20 Amp,
2-wire with ground. Properly
grounded branch circuit.
Key Hole Saw
Hammer
Wire cutter/stripper
Step ladder
Metal Snips
Saber saw
or Sawsall
Wire nuts
Phillips and flat blade
screwdrivers
Strain relief for
junction cover.
Spirit level
Flashlight
Safety glasses
10" round metal
duct, length to
suit installation.
Duct tape
7/16" Pivoting
hex socket with 4"
and 6" extensions
REMOVE THE PACKAGING
Remove the parts packages and packing materials.
Lift the hood out of the box.
IMPORTANT: Lift the hood by grasping
the outside edges of the exhaust opening on the top.
Carefully, lay the hood on its side. A support frame is
secured to the inside top of the hood. Remove the
attachment screws at the outside top. Discard screws.
Grasp the support
frame inside the
hood with both
hands and
carefully rotate out
of the opening.
Be careful not to
scratch the hood.
Hood
Parts Parts
Parts
Motor
Mounted
on Skid
Shipping Carton
Place the hood on a protective surface to prevent
scratches and damage to the stainless steel finish.
The hood motor is shipped secured to the skid with 4
screws. Locate and remove 2 screws on each side of
the motor. Discard the shipping skid and screws.
Carpenters square
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 19 20

Comments to this Manuals

No comments