GE I-M1025 Installation Manual

Browse online or download Installation Manual for Unknown GE I-M1025. GE I-M1025 Installation Instructions User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 21
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
© Copyright 2012 General Electric Company 2012/07/02
g GE Energy
Motor Installation
And Maintenance Instructions
Vertical AC Small Industrial Motors
NEMA Frame Sizes: 213 to 449
NEMA Type P Base, Weather Protected Type 1
High Thrust, Hollow and Solid Shaft
Ball Type Non-Reverse Couplings
And Bolted Couplings
Models: 5KXXXDTTXXXX
Models: 5KEXXXDTTXXXX
GEI-M1025-B
Page view 0
1 2 3 4 5 6 ... 20 21

Summary of Contents

Page 1 - And Maintenance Instructions

© Copyright 2012 General Electric Company 2012/07/02 g GE Energy Motor Installation And M

Page 2 - Table of Contents

GEI-M1025-B 8 V. MAINTENANCE WARNING: Before initiating maintenance procedures, disconnect all power sources to the motor and accessories. For

Page 3

GEI-M1025-B 9 E. Cleaning with Water and Detergent This method is very effective in cleaning windings when used with a low-pressure steam jenny

Page 4

GEI-M1025-B 10 Amount and Interval Table for Grease Lubricated Bearings Frame Size Upper Thrust Brg Number of Pumps Lower Guide Brg Number of Pu

Page 5

GEI-M1025-B 11 If during operation, the oil level goes above the maximum shown on the sight gage, drain enough oil to bring the level back within

Page 6

GEI-M1025-B 12 H. Re-Assembling the Upper End The lower guide bearing is restrained to take momentary up thrust. When reassembling the upper

Page 7 - B. Mounting

GEI-M1025-B 13 VI. OPERATIONAL DIFFICULTIES Some operating difficulties may occur. Common causes are given in the table below and should be cor

Page 8 - A. Steps Prior to Starting

GEI-M1025-B 14 VII. FAILURE WARNING: An extreme overload or electrical failure may result in heating or arcing which can cause the insulation

Page 9 - B. Initial Start

GEI-M1025-B 15 X. FASTENER TORQUES A. Medium carbon steel fasteners per ASTM A449 Type 1. B. Stainless steel fasteners per ASTM F593. C. Thr

Page 10

GEI-M1025-B 16 GIB KEY BALLS NOTE: Thoroughly clean coupling & all related components prior to mounting on motor. COUPLING BOLTS COUPLING LOC

Page 11 - F. Bearings and Lubrication

GEI-M1025-B 17 2. Bolted Coupling - Steel balls not used on Bolted Coupling assemblies. Note: Steel balls not used on bolte

Page 12

GEI-M1025-B Table of Contents I. General Information ...

Page 13 - G. Couplings

GEI-M1025-B 18 B. 320 - 449 Frame Non-Reverse and Bolted Coupling Coupling Kit Packing List Item Quantity Upper Half Coupling 1 Coupling Bolts

Page 14

GEI-M1025-B 19 2. Bolted Coupling - Steel balls not used on Bolted Coupling assemblies. NOTE: Thoroughly clean coupling & all rel

Page 15 - VI. OPERATIONAL DIFFICULTIES

GEI-M1025-B 1 I. GENERAL INFORMATION A. How to Properly Use this Instruction Manual This installation and maintenance manual has been written

Page 16

GEI-M1025-B 2 C. Safe Motor Operation Information WARNINGS: High voltage and rotating parts can cause serious or fatal injuries.

Page 17

GEI-M1025-B 3 D. Description of Labels and Nameplates Motor rating and identification data are furnished on packing labels and motor

Page 18

GEI-M1025-B 4 A. Unpacking If the motor has been exposed to low temperatures, unpack it only after it has reached the temperature of the room i

Page 19 - GEI-M1025-B

GEI-M1025-B 5 B. Mounting 1. Motors with Oil-Lubricated bearings must be mounted on a level surface to prevent oil leakage and for proper oper

Page 20 - damage to the equipment

GEI-M1025-B 6 3. When mounting conditions permit, the conduit box may be rotated so that the conduit entrance can be made upward, downward, or f

Page 21

GEI-M1025-B 7 B. Initial Start WARNING: Be sure the motor is not running and the power supply is disconnected before performing the final che

Comments to this Manuals

No comments