GE BL Series Installation Guide

Browse online or download Installation Guide for Motorcycle Accessories GE BL Series. GE BL Series Installation Guide User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 6
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
GE
Lighting
imagination at work
(BL Series - Continuous Run Option)
Lumination
TM
LED Luminaires
Installation Guide
BEFORE YOU BEGIN
Read these instructions completely and carefully.
WARNING/AVERTISSEMENT
RISK OF ELECTRIC SHOCK
• Turn power off before inspection, installation or removal.
• Properly ground electrical enclosure.
RISK OF FIRE
• Follow all IEC and local codes.
• Use only IEC approved wire for input/output connections.
Minimum size 14 AWG (0.75mm
2
).
Provided in the Package
• Luminaire without end covers
• Universal mounting brackets (4 pieces)
• M3x12mm screws for mounting bracket installation (8 pieces)
• M3 wingnut (8 pieces)
• Ceiling grid screw for grid and bracket xing (4 pieces)
• M4x16mm screw for bracket to bracket xing (2 pieces)
• M4 nut for bracket to bracket xing (2 pieces)
• Primary diffuser
• Optional low glare diffuser with protective foil
• Joiner pins (2 pieces)
Tools and Components Required
• For end cover install: Philips headed screwdriver
• For bracket to bracket xing: 7mm wrench or socket
• BL Series 4’’ Wide End Covers – SKU 85598
• BL Series CE Continuous Leader Cable (1-10V) –SKU 85601
• BL Series CE Continuous Leader Cable (DALI) - SKU 85675
Important
• 120-127V 60Hz - maximum 33 meters of luminaires (various unit)
can be connected on a single through wiring run.
• 220-240V 50/60Hz - maximum 64 meters of luminaires can be
connected on a single through wiring run.
• Please see technical data sheet for electrical properties to ensure
safe installation.
• Under any circumstance, maximum driver current through
connected xtures shall not exceed 12 A.
Save These Instructions
Use only in the manner intended by the manufacturer. If you
have any questions, contact the manufacturer.
Prepare Electrical Wiring
Electrical Requirements
• The LED driver must be supplied with
120-240 VAC, 50/60 Hz and connected to an
individual properly grounded branch circuit.
Use min. 600V 75°C supply conductor.
Grounding Instructions
• The grounding and bonding of the overall
system shall be done in accordance with
IEC and local codes.
Page view 0
1 2 3 4 5 6

Summary of Contents

Page 1 - LED Luminaires

GELightingimagination at work(BL Series - Continuous Run Option)LuminationTM LED LuminairesInstallation GuideBEFORE YOU BEGINRead these instructions c

Page 2 - Wiring Diagrams

Wiring DiagramsFollow diagram A for 0-10 V or diagram B for DALI.Optional Installation: 1-10 Volt Dimming or DALI Lighting ControllerLine (black)Neut

Page 3 - Luminaire Installation

3Connect the accessory kit to the through wiring. Push wires into xture.4Snap in the terminal block to the factory mounted holder. Be careful not to

Page 4

1For the luminaires that will be in the middle of the run, insert two pins into one end only. Slide pins into the bottom screw grooves, leaving approx

Page 5 - Diffuser Installation

6879Plug together wires between luminaires.Join mounting brackets together with M4 hex head screw and nut. Also tighten wingnuts.Carefully align pins

Page 6 - 01333785

IND076-08231301333785GE Lighting • gelighting.comGE Lighting is a subsidiary of the General Electric Company. Lumination is a trademark of GE Lighti

Comments to this Manuals

No comments